Secondary power and standby batteries: what NFPA 72 asks of them
24 hours quiet, then the alarm. Why the battery calculation matters more than a load test, and why an undated battery is the installer's problem.

Every fire alarm system runs on two independent power supplies. NFPA 72 Chapter 10 calls for a primary source and a secondary source that takes over when the primary fails. In most buildings the secondary source is the set of batteries in the panel cabinet, and if those batteries are dead the system has one power supply, not two.
How long the batteries have to carry the system
The secondary supply has to carry the system through a long quiet period and then still sound the alarm at the end of it. Chapter 10 sets the figures, and Chapter 24 adds to them for voice systems.
| System | Standby | Alarm at the end of standby |
|---|---|---|
| Protected premises fire alarm | 24 hours | 5 minutes, driving every evacuation notification appliance |
| Voice or emergency communications | 24 hours | 15 minutes at maximum connected load |
The battery calculation is what proves this. A system can pass a load test today and still fail the math.
From the field
Amplifiers pull far more than horns. A voice system sized on a horn assumption is undersized.
Switching over
When primary voltage is insufficient, the secondary supply has to take over automatically within 10 seconds. Required signals cannot be lost, interrupted or delayed by more than 10 seconds because of a primary power failure. That 10 second figure is for the protected premises system. Supervising station facilities and equipment get 60 seconds, so do not apply one number to both.
Recharging after a discharge
After a full discharge, the panel has to bring the batteries back to full charge within 48 hours on its own. A charger that cannot do this is usually the reason a site keeps failing its next standby test.
Date codes and replacement
Under NFPA 72 Chapters 10 and 14, batteries are marked with the month and year they were made, in month/year format. Where the manufacturer did not mark them, the installer has to obtain the date code and mark the batteries. Batteries are then replaced against that date rather than run until they fail.
That puts the duty on the installer, so "the manufacturer did not put a date on it" is not an answer to the finding.
From the field
Undated batteries in a cabinet are one of the easiest findings to write and one of the most common.
The equipment the signal depends on
The panel batteries are not the only secondary power that matters. NFPA 72 Chapter 26 requires transmitters, and shared equipment at the premises that the signal depends on, such as a router or modem, to carry at least 24 hours of secondary power. Shared equipment may drop to 8 hours, but only where the AHJ accepts it and a risk analysis supports it, so it is not something to assume from the installer's say so. Equipment serving only additional communications paths needs none, provided the first path already meets the communications requirements.
A panel with 24 hours of battery feeding a router on unswitched utility power is not monitored after a power cut. Follow the signal from the panel to the point where it leaves the building and ask what keeps each piece running.
Keep reading

Kitchen hood suppression systems: the hazard, the system and the inspection
The grease decides whether a hood needs a system. What happens when it discharges, where the pull goes, and the four changes that force an upgrade.

Changed the system? What NFPA 72 says you retest
One added horn is a one device test. One added horn plus a programming change is not. How the scope of reacceptance follows what changed.

Keeping the way out usable: egress doors, locks and obstructions
A clear corridor is not signed off once. One motion to open, doors that unlock before the horns, and the delayed egress condition most often broken.

Fire extinguisher inspections: the owner's monthly look and the service visit
The monthly check is the owner's job, and it is the one most often not happening at all. What NFPA 10 asks for, from placement to hydro.

Spot smoke detector spacing and placement: the NFPA 72 basics
A 30 foot grid is where layout starts, not where it ends. The rules that decide whether a corner, a partitioned office or a hidden detector is covered.

Emergency lighting testing: the monthly and annual tests NFPA 101 asks for
The 30 second monthly test, the 90 minute annual, and why a wall of self testing units still needs somebody to look at it.