Spot smoke detector spacing and placement: the NFPA 72 basics
A 30 foot grid is where layout starts, not where it ends. The rules that decide whether a corner, a partitioned office or a hidden detector is covered.

Spot smoke detector layout comes down to a handful of rules in NFPA 72 Chapter 17: a nominal spacing, a coverage test for every point on the ceiling, where a wall mounted detector can sit, and how partitions divide a space. Here they are in plain English.
Nominal spacing and the seven tenths rule
On a smooth flat ceiling the nominal spacing for spot smoke detectors is 30 feet, unless the detector listing says otherwise. That is a starting grid, not a guarantee. Ceiling geometry and airflow move devices.
The rule that does the real work is coverage: every point on the ceiling has to fall within seven tenths of the listed spacing from a detector. That is what lets you stretch spacing down a corridor, and what forces you to tighten it in an odd shaped room.
From the field
The seven tenths rule decides whether a corner is covered. Run it before you argue about a device count.
Wall mounting
A wall mounted spot smoke detector sits with its top close to the ceiling, inside a band measured down from the ceiling, not anywhere on the wall. The band is measured to the top of the detector. The 2019 edition of NFPA 72 sets only a limit of 12 inches below the ceiling, while older editions also set a minimum distance down from the ceiling. Check the edition your AHJ enforces before writing up a detector mounted tight to the ceiling.
Smoke rises and layers. A detector mounted at eye level is decoration.
Partitions
A partition that extends up to within 15 percent of the ceiling height makes the spaces on either side separate rooms for detection. Separately, when you measure spacing you treat that partition as a wall. The two rules work together: apply only the second and you get the right spacing in the wrong number of rooms.
From the field
Tall cubicle walls and demountable partitions catch people out. That is two rooms, and you measure to the partition as if it were a wall.
Detectors nobody can see
A detector in a concealed location more than 10 feet above the floor, or anywhere its own indicator cannot be seen by responding personnel, needs remote alarm indication at a location the AHJ accepts. The exception is narrow: it applies only where the control unit identifies that specific detector and the drawings show its specific location and functions. A remote indicator, where fitted, carries a permanent placard naming the detector location and the area it protects.
Initiating devices subject to mechanical damage are protected. Any guard or cover has to be listed for use with that device, and it cannot degrade how the device performs.
From the field
Above hard ceilings and in shafts, an addressable panel that names the device satisfies the remote indication rule. A generic cage over a smoke detector changes its airflow and voids the listing.
Deficiency or recommendation
Keeping a spot detector clear of a supply diffuser is annex guidance in NFPA 72 Chapter 17, not a requirement. It belongs on a report as a recommendation, not as a code deficiency.
Detection added to meet a specific fire safety objective, where no law or code required it, does not oblige you to add detectors beyond what that objective needs. It is excused only from the prescriptive spacing criteria of Chapter 17. Listing, installation, power, monitoring for integrity and testing all still apply in full.
Keep reading

Fire extinguisher inspections: the owner's monthly look and the service visit
The monthly check is the owner's job, and it is the one most often not happening at all. What NFPA 10 asks for, from placement to hydro.

Secondary power and standby batteries: what NFPA 72 asks of them
24 hours quiet, then the alarm. Why the battery calculation matters more than a load test, and why an undated battery is the installer's problem.

Kitchen hood suppression systems: the hazard, the system and the inspection
The grease decides whether a hood needs a system. What happens when it discharges, where the pull goes, and the four changes that force an upgrade.

Emergency lighting testing: the monthly and annual tests NFPA 101 asks for
The 30 second monthly test, the 90 minute annual, and why a wall of self testing units still needs somebody to look at it.

What goes in a fire alarm drawing package: the NFPA 72 minimum
Floor plans, risers, calcs and the sequence of operation. What Chapter 7 expects on every system, and where it has to live once the job is done.