Free tools
Fire alarm & life safety calculators
Quick reference tools for the field and the office, free to use, no account required.
Same rule as the Learning Center: original tools, code sections cited so you can go
confirm the real thing yourself.
NFPA 72 · NEC
Code Reference
The requirements you actually run into, in plain English.
Search and filter by topic or trade, and flag down the ones that get written up most often.
Every entry points at the chapter it comes from so you can go read it yourself, which is the
skill worth having. Not a calculator, a lookup.
NFPA 72 · 101 · 10 · 25 · 80 · 96
Common Violations
What actually gets written up, sorted by category.
Browse the findings by the categories you walk a building in: fundamentals and power,
initiating, notification, ITM, egress, extinguishers, fire doors, sprinkler, kitchen
suppression, site access. Each one carries report language neutral enough to hand an owner,
the chapter behind it, and whether it is a violation at all or only a recommendation.
Or describe what you found in your own words and it will find it.
IBC Table 1004.5
Occupant Load Estimator
Estimate occupant load from a space's function and area.
Pick the function of the space, enter its area, and get an estimated occupant load
using the standard square-foot-per-person factors. Covers the 2015 through 2024
IBC/IFC editions.
NEC Chapter 9
Conduit Fill Calculator
Find the smallest conduit size for a fire alarm run.
Add every jacketed FA cable or individual THHN conductor going into the run, pick a
conduit type, and see the smallest trade size that passes the NEC fill rule. Multiconductor
cable counts as a single conductor at its overall diameter, per Chapter 9 Note 9.
NFPA 72 §10.6.7.2.1
NAC Voltage Drop Calculator
Check end-of-line voltage on a notification circuit.
Enter wire gauge, run distance, and connected current to check the notification
circuit's end-of-line voltage against a device's minimum operating voltage.
NEC Article 314
Box Fill Calculator
Whether the conductors, devices, and grounds actually fit the box.
Counts everything that consumes volume, not just the conductors: device yokes at two
allowances each, internal clamps, support fittings, and the grounding conductors under
the rule your adopted edition uses.
NFPA 72 §10.6.7.3
Standby Battery Calculator
Size the secondary battery from standby and alarm current draw.
Enter the system's standby and alarm current draw and required operating time to get
the required battery capacity, with the edition-correct aging safety factor applied.
NFPA 72 §18.5.5
Strobe Candela Calculator
Minimum candela for wall, ceiling, sleeping room, and corridor.
Enter room size (and ceiling height, for ceiling mount) to get the minimum required
candela. Covers wall mount, ceiling mount, sleeping rooms, and corridors.
NFPA 72 §17.6 & §17.7
Smoke & Heat Detector Spacing
Detector count with high-ceiling and beam/joist reductions.
Enter room size and listed spacing to get the detector grid count. Heat detector mode
applies the ceiling-height derating table and beam/joist spacing reductions.
Constant-voltage audio
Speaker Circuit Calculator
Current draw, voltage drop, and dB loss for a speaker circuit.
Enter the total tapped wattage, wire gauge, and run distance on a 25V, 70V, or 100V
speaker circuit to get current draw, voltage drop, and dB line loss.
NFPA 101 & IBC §907
Fire Alarm Requirement Wizard
Find out whether a building needs a fire alarm system, by occupancy.
Pick NFPA 101 or IBC, then the occupancy type, to see whether a fire alarm system is
required and why, with the exact code section cited.
Hand-bender trade math
Conduit Bending Calculator
Offset, saddle, 90° stub, and back-to-back bends, with a diagram for each.
Enter your offset depth or obstruction height and bend angle to get the mark-to-mark
distance and shrink, a stub height to get the deduct mark, or a back-to-back distance to get
both marks. Every mode also shows where the bender goes: which of the three symbols on the
casting — arrow, teardrop, or star — lines up with the mark you just made.